With lots of layout work time in the
last 3 weeks we have managed to lay 525 feet of cork and track for
the main lines, as well as got 90% of the wiring done.
With all the main line track in place
it is time to start to run trains to find flaws. So far we have only
found some small problems that have already been fixed.
Here are some pictures and video of the
test trains
Here is the last track section that needed to be connected to complete the main line
Testing the Blue loop
layout from above
Thanks for looking