Saturday, February 22, 2014

Main line done

With lots of layout work time in the last 3 weeks we have managed to lay 525 feet of cork and track for the main lines, as well as got 90% of the wiring done.

With all the main line track in place it is time to start to run trains to find flaws. So far we have only found some small problems that have already been fixed.

Here are some pictures and video of the test trains

Here is the last track section that needed to be connected to complete the main line


Testing the Blue loop


layout from above
























Thanks for looking